List of Archives:

S. No. Details Last Date for Submission Download Documents
1 RFQ- Paint work of front road side boundary wall
November 17, 2017 up to 03.00 pm PDF Format
2 RFQ- Providing and fixing of indoor signage in laboratory
November 08, 2017 up to 11.00 am PDF Format
3 NIT-Provision of research seed store with use of existing material in research field, NABI    

October 31, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
4 NIT-Provision of wire mesh door in hostel, shed cover on buildings and other works at Main Campus, NABI, Knowledge City, Sector-81, Mohali.    

October 31, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
5 NIT-Construction of ATM room & security post with pre-fabricated structure at Main Campus, NABI, Knowledge City, Sector-81, Mohali.    

Addendum
Extended Upto November 17, 2017 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
6 NIT-Provision of research seed store with use of existing material in research field, NABI    

October 09, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
7 NIT-Provision of wire mesh door in hostel, shed cover on buildings and other works at Main Campus, NABI, Knowledge City, Sector-81, Mohali.    

October 09, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
8 NIT-Provision of RCC retaining wall on pile foundation for prevention of soil erosion from Natural Choe in campus    

September 14, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
9 NIT-Provision of research seed store with use of existing material in research field, NABI    

September 05, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
10 NIT-Provision of wire mesh door in hostel, shed cover on buildings and other works at Main Campus, NABI, Knowledge City, Sector-81, Mohali.    

September 05, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
11 NIT-Construction of transgenic glass, transgenic net house with existing material, fittings etc at Main Campus, NABI, Knowledge City, Sector-81, Mohali    

Addendum
Extended upto August 28, 2017 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
12 NIT-Providing and fixing of Stainless Steel letters in golden colour along with perforated logo at Main Campus, NABI, Knowledge City, Sector-81, Mohali.    

August 9, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
13 NIT-Provision of research seed store with use of existing material in research field, NABI, Knowledge City, Sector-81, Mohali.    

August 2, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
14 NIT-Provision of wire mesh door in hostel, shed cover on buildings and other works at Main Campus, NABI, Knowledge City, Sector-81, Mohali.    

August 2, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
15 NIT-Operation and manning of 350 KLD SBR technology- sewerage treatment plant, effluent treatment plant at Sector-81, Mohali.    

July 31, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
16 NIT-Providing and fixing of Stainless Steel letters in golden colour along with perforated logo at Main Campus, NABI, Knowledge City, Sector-81, Mohali.    

June 27, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
17 NIT-Supply, Installation, testing and commissioning of water supply pumps at Sector-81, Mohali..    

Addendum
Extended upto July 31, 2017 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
18 NIT-Misc. civil works at Main Campus, NABI, Knowledge City, Sector-81, Mohali.    

June 07, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
19 NIT-Providing and fixing of tensile structured membrane fabric car parking covering, awning etc at Main Campus, NABI, Knowledge City, Sector-81, Mohali    

May 22, 2017 up to 3.00 PM Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
20 RFQ- PROVISION OF 12MM TOUGHENED GLASS DOOR ALONGWITH PATCH FITTINGS AT RESIDENCE OF ED, NABI & CEO, CIAB
April 22, 2017 up to 2.00 pm PDF Format/Word Format
21 NIT- Provision of Acoustic treatment work at Laboratory Building, Main Campus, Sector-81, Mohali.    

March 21, 2017 up to 03.00 pm Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
22 NIT- Dismantling, loading, transportation, unloading and stacking of civil, public health items installed at above mentioned interim facility to Main Campus, NABI-CIAB, sector-81, Mohali.    

Addendum  
December 28, 2016 up to 11.30 am Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
23 NIT- Providing and fixing of auditorium carpet at Main Campus, NABI-CIAB, Sec 81, Mohali. November 18, 2016 up to 3.00 pm Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
24 NIT- Construction of Transgenic Screen houses (2nos) at Main Campus, NABI, Sec 81, Mohali. June 24, 2016 up to 3.00 pm Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
25 NIT- Construction of Transgenic Screen houses (2nos) at Main Campus, NABI, Sec 81, Mohali.
May 27, 2016 up to 3.00 pm Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
26 NIT- Providing, fixing of net shade system and insulation at transgenic house at Main Campus, NABI, Sec 81, Mohali.
November 02, 2015 up to 3.00 pm Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
Tender Drawings (Zip)

27 RFQ- Providing and fixing self-glowing photoluminscenet fire signage & Evacuation plan at Interim Facility, NABI-CIAB, Mohali
May 25, 2015 up to 3.00 pm PDF Format/Word Format
28 NIT- Construction of Containment facility/ Transgenic house with environment controlled parameters at Main Campus, NABI, Sec 81, Mohali.

January 30, 2015 Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
Tender Drawings (Zip)
29 RFQ- Renewal of NOC from Punjab Pollution Control Board (PPCB) for consent to establishment of Main Campus, NABI.

November 14, 2014 PDF Format/Word Format   

30
NIT- Construction of Containment facility/ Transgenic house with environment controlled parameters at Main Campus, NABI, Sec 81, Mohali.

CORRIGENDUM

November 24, 2014

Extended Last Date :
December 01, 2014
Technical Bid Doc Vol-I
Financial Bid Doc Vol-II
Tender Drawings (Zip)
31 RFQ- Preparation & submission of six monthly compliance reports to MOEF/SEIAA/CPCB/PPCB at Sector-81, Mohali.

July 22, 2014 PDF Format/Word Format   
32 EOI - Engagement of consultant for the designing of containment facility with environment controlled parameters at NABI, Sec 81, Mohali
April 01, 2014 PDF Format/Word Format   
33 Call of quotation for P&F Toughened Glass Partition at NABI, Mohali December 19, 2013 PDF Format/Word Format  
34 Name of Work:- Establishment Works of Type-1 Radioisotope Lab at NABI interim facility, Mohali” October 23, 2013 PDF Format/Word Format  
35  Name of Work:- Establishment Works of Type-1 Radioisotope Lab at NABI interim facility, Mohali” on Turnkey basis

Corrigendum
August 22, 2013 & 03:00 PM PDF Format/Word Format  
36  Name of Work:- Engagement of design consultant for the designing of transgenic house with environmental parameters at Main Campus, NABI, Sec 81, Mohali July 30, 2013 & 03:00 PM PDF Format/Word Format  
37 Name of Work: Dismantling of old ceiling and installation of new grid system false ceiling at Bio-informatics server room, Interim Facility, NABI.    

July 05, 2013 & 03:00 PM PDF Format/Word Format 
38 Name of Work: - PROVIDING AND FIXING MID HEIGHT TOUGHENED GLASS CABINS NEAR CONFERENCE ROOM AT GROUND FLOOR, INTERIM FACILITY, NABI.    

 Layout Plan. 
July 01, 2013 & 03:00 PM PDF Format/Word Format 
39 Short Term Notice - CALL OF QUOTATIONS for Miscellaneous Civil, Painting works and Water Supply Works at Interim Facility and Main Campus, NABI, Mohali.    
April 25, 2013 & 03:00 PM PDF Format/Word Format
40 Short Term Notice Inviting Tender - FOR BORING, SUPPLY, INSTALLATION AND COMMISSIONING OF BORE WELL AT SEC.81, MOHALI (Pb.)     

Bank Guarantee Format

Jan 28, 2013 & 03:00 PM PDF Format/Word Format   
41
Notice Inviting Tender - Providing & Fixing Portable Offices along with Pantry and Toilet at Sec- 81, Mohali  

Portabe Office Design Diagram


July 06, 2012 & 03:30 PM

PDF Format/Word Format  
42 Notice Inviting Tender (NIT) for Selection of a PSU/Govt Consultancy Firms for Project Management Consultancy Services  

Addendum  

Minutes of the PreBid Meeting for PMC

PSU Queries and NABI clarifications during the Pre Bid Meeting

Master Plan  / Survey Plan  

Shortlisted PSUs for Presentation  


June  20, 2012  Download PDF Format(Revised)   

 Annexure - I (for PMC) 


Selected PSU for PMC Services  
43 Exression of Interest for undertaking Civil & Electrical works for the 2nd Floor of the Interim Facility.  

Layout Plan for 2nd Floor of the Interim Facility.

February 06, 2011 -
44 SETTING UP, INSTALLATION AND COMMISSIONING OF FIRE ALARM SYSTEM FOR TISSUE CULTURE AND FOOD TECHNOLOGY LABORATORY ON THE FIRST FLOOR HAVING APPX. AREA OF 12000 sq ft. December 22, 2011 PDF Format/Word Format
45 Supply, Installation, Testing and Commissioning of Green House at NABI, Main Campus, Sector 81, Mohali, Punjab August 16, 2011 PDF Format/Word Format
46 Setting Up, Installation, Commissioning of HVAC System and Creating Facility for Clean Room, at First Floor, NABI September 09, 2011 PDF Format/Word Format
47 Outsourcing Institutional Work NA NA
48

(No.NIT/WORKS_TUBEWELL/1/2010)-Boring, supply and installation of Tubewell in the compound of NABI, Sector-81, Mohali, having capacity of 1000-1200 ltr/pm having 300’ TDH and 1000’ – 1200’ bore depth.

 Date of submission of tender documents extended upto 15th June, 2010

NA

PDF Format/Word Format

49

(No.NIT/WORKS_HORTICULTURE/3/2010)-Contract for the Plantation/Horticulture Work for development of Green Belt in NABI, Sector-81, Mohali inside boundary of a 35 acre plot

NA

PDF Format/Word Format

50 (No.NIT/INT-FACILITY/2010/5)-EXPRESSION OF INTEREST FROM LABORATORY DESIGNERS/ARCHITECTS NA PDF Format/Word Format
51

(No.NIT/WORKS_CHAIN_LINK_FENCING/2/2010)- CHAIN LINK FENCING (SUPPLY AND ERECTION)

Date of submission of tender documents extended upto 25th June, 2010

NA

PDF Format/Word Format

52 No.NIT/WORKS_HORTICULTURE/6/2010-Contract for the Plantation/Horticulture Work for development of Green Belt in NABI, Sector-81, Mohali inside boundary of a 35 acre plot NA PDF Format/Word Format
53 No.NIT/WORKS_DU/7/2010-Short Tender Notice for Purchase of 2BR/3BR Flats
Date of submission extended upto July 30, 2010
NA NA
54 Construction of Temporary Road (Brick-On-Edge)-(No.NIT/WORKS_T_ROAD/9/2010) NA PDF Format/Word Format
55 Consultants to secure Statutory Clearances required for NABI Campus Development (No.NIT/CONSULTANTS_STATUTORY_CLEARANCE/8/2010 NA NA
56 Call for ideas on "Value from agricultural surplus, agro-industry by-products and farm waste" (Secondary Agriculture Initiative) NA PDF Format/Word Format
57 Expression of Interest (EOI) for Architectural Consultation for NABI (Main Campus), Mohali (No.EoI_Arch_10/2010)
Concept Plan, Knowledge City (Sector 81)
Site Plan
Survey Map
NA PDF Format/Word Format
58 Expression of Interest (EOI) for Architectural Consultation for NABI (Main Campus), Mohali (No.EoI_Arch_10/2010) NA View
59 Expression of Interest (EOI) for Architectural Consultation for NABI (Main Campus), Mohali (No.EoI_Arch_10/2010)
Zoning Plan
Survey Drawing
Concept Plan, Knowledge City (Sector 81)
Site Plan
Survey Map
Nalla passing through the site
Approximate marking of the site
Location Map
Marking of site
NABI Brochure
            NABI
            NABI for Agri-food & nutrition security
            Technical Components of NABI
            Product & Trait Orientation, Vision and Mission
NA View
60 Civil Work and Mechanical Work for setting up of Tissue Culture and Food Technology Laboratory on the first floor having appx. area of 12000 sq ft.
Corrigendum
March 25, 2011 & 3:00 PM PDF Format/Word Format
61 Civil Work and Mechanical Work for setting up of Tissue Culture and Food Technology Laboratory on the first floor having appx. area of 12000 sq ft.
Corrigendum
Addendum
Addendum
April 23, 2011 & 3:00 PM PDF Format/Word Format
62 Pre-Indent Conference for Poly house and Green house June 4, 2011 & 12:00 Noon NA
63 Civil and mechanical work for setting up of a tissue culture and food technology laboratory on the first floor  having approx. area of 12000 sqft. May 31, 2011 & 3:00 PM PDF Format/Word Format

Last Updated: July 03, 2017